Established a new railway assessment system which decreased overhead costs by 95% and reduced setup time by 99% by creating custom-built sensors and data processing software.
•
Developed a sensor prototype by integrating mpu6050 Gyro-Accelerometer with a GPS receptor.
•
Designed a data visualization and interaction GUI using PyQt, NumPy, Matplotlib, and Google Earth.
•
Verified results by generating verification data through surveying 55 km of mountain railway from sea level to 7000 feet.
•
Designed, manufactured, and coordinated the installation of lifting brackets that supports locomotive weighing at 28 tons